Sledovat
Askiner Gungor
Název
Citace
Citace
Rok
Issues in environmentally conscious manufacturing and product recovery: a survey
A Gungor, SM Gupta
Computers & Industrial Engineering 36 (4), 811-853, 1999
17011999
Disassembly line in product recovery
A Güngör, SM Gupta
International Journal of Production Research 40 (11), 2569-2589, 2002
3442002
A solution approach to the disassembly line balancing problem in the presence of task failures
A Gungor, SM Gupta
International journal of production research 39 (7), 1427-1467, 2001
2842001
Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships
KE Moore, A Güngör, SM Gupta
European Journal of Operational Research 135 (2), 428-449, 2001
2662001
Disassembly sequence planning for products with defective parts in product recovery
A Gungor, SM Gupta
Computers & Industrial Engineering 35 (1-2), 161-164, 1998
2561998
An evaluation methodology for disassembly processes
A Gungor, SM Gupta
Computers & Industrial Engineering 33 (1-2), 329-332, 1997
2161997
Disassembly line balancing problem: a review of the state of the art and future directions
E Özceylan, CB Kalayci, A Güngör, SM Gupta
International Journal of Production Research 57 (15-16), 4805-4827, 2019
2122019
Disassembly sequence plan generation using a branch-and-bound algorithm
A GÜngÖr, SM Gupta
International Journal of Production Research 39 (3), 481-509, 2001
1782001
Evaluation of connection types in design for disassembly (DFD) using analytic network process
A Güngör
Computers & Industrial Engineering 50 (1-2), 35-54, 2006
1642006
A model proposal for green supply chain network design based on consumer segmentation
S Coskun, L Ozgur, O Polat, A Gungor
Journal of cleaner production 110, 149-157, 2016
1612016
A Petri net approach to disassembly process planning
KE Moore, A Gungor, SM Gupta
Computers & Industrial Engineering 35 (1-2), 165-168, 1998
1511998
Multi-objective fuzzy disassembly line balancing using a hybrid discrete artificial bee colony algorithm
CB Kalayci, A Hancilar, A Gungor, SM Gupta
Journal of Manufacturing Systems 37, 672-682, 2015
1462015
Disassembly line balancing
A Gungor, SM Gupta
Omnipress, 1999
1201999
Mixed model disassembly line balancing problem with fuzzy goals
T Paksoy, A Güngör, E Özceylan, A Hancilar
International Journal of Production Research 51 (20), 6082-6096, 2013
1032013
Disassembly process planning using Petri nets
KE Pbioore, A Gungor, SM Gupta
Proceedings of the 1998 IEEE International Symposium on Electronics and the …, 1998
691998
Complications in disassembly line balancing
A Gungor, SM Gupta, K Pochampally, SV Kamarthi
Environmentally conscious manufacturing 4193, 289-298, 2001
542001
Disassembly sequence planning for complete disassembly in product recovery
A Gungor, SM Gupta
Omnipress, 1998
531998
Pamuklu tekstiller ve çevre: bir bornozun yaşam döngü değerlendirmesi
A Güngör, S Palamutcu, Y İkiz
Tekstil ve Konfeksiyon, 2009
432009
Product recovery using a disassembly line: challenges and solution
SM Gupta, A Gungor
Proceedings of the 2001 IEEE International Symposium on Electronics and the …, 2001
412001
Disassembly Petri net generation in the presence of XOR precedence relationships
KE Moore, A Gungor, SM Gupta
SMC'98 Conference Proceedings. 1998 IEEE International Conference on Systems …, 1998
411998
Systém momentálně nemůže danou operaci provést. Zkuste to znovu později.
Články 1–20